Consulting Services for the Feasibility study for new transmission facilities in Trishuli 3B Hub and Chilime Hub 220/132/33 kV substations and 220 kV overhead line (26.5 KM Length) - KFW

Funding Agency: KFW
Client: The Nepal Electricity Authority (NEA), Central Office, Durbarmarg, Kathmandu, Nepal.
Date:  Dec 2013 – July 2014

Total Management Services Pvt. Ltd. (TMS) as an associated partner to Lahmeyer International GmbH (LI), had undertaken an investigation to assess the technical and economic justification of the planned transmission system expansion, which encompasses the following services:

  • Brief Assessment of Power Sector in Nepal
  • Review and update of existing Power systems
  • Review of the line route survey

a.      Map Study

b.      Walkover Survey (Baseline Survey)

  • Preliminary survey of new substation areas
  • Feasibility study and conceptualizing its design document.
  1. Transmission Line Concept
  2. Standard Design Criteria
  3. Factors of safety
  4. Drawing of defined structures and documents
  5. Tower outline silhouette (Drawings)
  6. Substation Design 
  7. Verification of the suitability of the proposed site
  8. Electro-mechanical works, including protection and control
  9. Communications and SCADA
  10. Civil, structural, and architectural works
  • Surveys and Investigations

a.      Line route and substation site Survey

b.      Geotechnical Investigations

c.       Soil investigations

  • Training Requirement Analysis
  • Cost estimate, Economic and Financial analysis
  • Develop an Impact Assessment in the context of macro-economic, socio-economic, and economic conditions.
  • Environmental Safeguards

a.      Environment Study

b.      Support the scoping process, including developing the proposed TOR for ESIA.

c.       Environment Management Action Plan

d.      Review of IEE of 220kv Trishuli Chilime Transmission Line Social Safeguards

  • Social Safeguards

a.    Social Studies

b.    ESIA Prediction

c.    Resettlement Action Plan(RAP)

d. Social Management Action Plan